November 25, 2024

The northwest stairway connecting the Olin Library basement and first floor, between the main entrance and Amit Bhatia Libe Café, will be closed Monday, 11/25 through the...

October 25, 2024

A crane will be deployed on the southeast side of Olin Library on Monday, 10/28 to hoist mechanical equipment in and out of the subbasement through the adjacent generator pit...

October 25, 2024

The Uris Library Main Entrance will be closed to the public starting Monday, 10/28 for about a week as contractors put the finishing touches on the entry steps Public access to...

September 27, 2024

The Olin 1st floor public elevator lobby will need to close temporarily from Monday, 9/30 through Monday, 10/7 so the project can remove ductwork in the space Both public...

September 10, 2024

The Uris Library Main Entrance will be closed to the public starting Wednesday, 9/11 for scaffold installation on the roof over the next few days Public access to Uris Library...

September 9, 2024

A stone crane pad is being installed on the south side of Olin Library over the next two days A crane will arrive later this fall to hoist mechanical equipment in and out of the...

August 26, 2024

Phase 1 of the first floor is nearly complete The new service point and Walk-in Reference room opened last week in time for the start of fall classes The adjacent south reading...

August 13, 2024

The northwest stairway connecting the Olin Library basement and first floor, between the main entrance and Amit Bhatia Libe Café, will be closed Wednesday, 8/14 through Friday,...

June 28, 2024

Olin Library will be closed for a planned water shutdown on Saturday, 7/6 Uris Library will remain open to the public and typical services can be accessed from the desk inside the...

May 23, 2024

Beginning Tuesday, May 28, the large multi-user and single-user restrooms in the Olin Library basement will be taken offline for a much needed renewal This work will happen over...

May 1, 2024

Please enjoy the new construction progress photos and updated project info for Uris Library and McGraw Tower To view, please visit the Uris blog...

March 27, 2024

The Uris Library Main Entrance will be closed to the public beginning Monday, 4/1 through approximately Friday, 4/5 for restoration work on the exterior stairs Public access to...