2/22 Olin Power Loss on Levels B and 3
There has been an inadvertent power loss due to construction impacting lights in the following areas:
- B hallway by the restrooms
- Olin/Uris tunnel
- 3 west stairwell landing
- 3 elevator lobby
- 3 restrooms
The restrooms on 3 have been temporarily closed and signed off, and the contractor will string short-term lights in the B hallway. It will likely take a few days to get everything back on. Please exercise caution when moving through these areas.