The northwest stairway connecting the Olin Library basement and first floor, between the main entrance and Amit Bhatia Libe Café, will be closed Monday, 11/25 through the...
A crane will be deployed on the southeast side of Olin Library on Monday, 10/28 to hoist mechanical equipment in and out of the subbasement through the adjacent generator pit...
The Uris Library Main Entrance will be closed to the public starting Monday, 10/28 for about a week as contractors put the finishing touches on the entry steps Public access to...
The Olin 1st floor public elevator lobby will need to close temporarily from Monday, 9/30 through Monday, 10/7 so the project can remove ductwork in the space Both public...
The Uris Library Main Entrance will be closed to the public starting Wednesday, 9/11 for scaffold installation on the roof over the next few days Public access to Uris Library...
A stone crane pad is being installed on the south side of Olin Library over the next two days A crane will arrive later this fall to hoist mechanical equipment in and out of the...
Phase 1 of the first floor is nearly complete The new service point and Walk-in Reference room opened last week in time for the start of fall classes The adjacent south reading...
The northwest stairway connecting the Olin Library basement and first floor, between the main entrance and Amit Bhatia Libe Café, will be closed Wednesday, 8/14 through Friday,...
Olin Library will be closed for a planned water shutdown on Saturday, 7/6 Uris Library will remain open to the public and typical services can be accessed from the desk inside the...
Beginning Tuesday, May 28, the large multi-user and single-user restrooms in the Olin Library basement will be taken offline for a much needed renewal This work will happen over...
Please enjoy the new construction progress photos and updated project info for Uris Library and McGraw Tower To view, please visit the Uris blog...
The Uris Library Main Entrance will be closed to the public beginning Monday, 4/1 through approximately Friday, 4/5 for restoration work on the exterior stairs Public access to...