10/6/10 Update

Fall Break construction activities in the basement:

  • Asbestos abatement – ducts above the corridor proximate to the reading area (B48).
    • Schedule – Friday, October 8, Noon – 8 PM. Work will be complete for Saturday morning opening.
    • The corridor, some study tables and collections will be inaccessible beyond the entrance to the reading area and the fiche cabinets. A map for negotiating this part of the basement will be posted.
  • Installation of fire dampers at the ceiling level along the east/west corridor in B48 (reading room/collections space)
    • Schedule – Monday, October 10 and Tuesday, October 11
    • The space will remain accessible, but it will be noisy and circulation routes will vary over the course of the work.