Skip to main content



7/22/2011 – Update

July 25 – July 27 —  VESDA Pipe noise reduction: There will be additional work on the air sampling system installation at both ends of stack levels 3-7 which will result in muffling the sounds emanating from the wall units. It will require some drilling. We are hoping that this work will only take two […]

Update Categories