1/28/11 Update

The project will soon be entering the last construction phase for the first floor. Phase 9 construction (west end of 110, 111 and 101 offices, Periodical Room) will begin the week of February 7. In preparation, periodicals from the 101 Current Periodical Room were moved to the Willis Room in Uris Library on February 26. The following is the schedule for upcoming service and staff moves as well as events between January 31 and February 7.

  • Monday, January 31 — Fire alarm test (approx. 8 – 8:30 am). All new alarms will sound, including those just installed on the first floor. There will be a warning in advance that it is a test. Do not evacuate the building.
  • Monday, January 31 — Asbestos Abatement update, 703 Olin, 10:30-11:30 am
  • Thursday, February 3 — Most staff currently in 2nd floor Olin surge space return to former 110/101E locations
  • Friday, February 4 — Staff in 111 and 101 offices move to 2nd floor surge space
  • Monday, February 7 — Staff in 110 Olin West temporarily move to 218 Olin and 107 Olin
  • Monday, February 7 — Reference Reading Room, Printing, and 104/105 Reference service areas reopen

Specific locations for relocated staff will be available at the Olin Circulation and Reference desks.