8/9/10 Update

8/9/10 – The following is planned for this week:

Second floor:
• Installation of the corridor wall

Basement:
Close to the end of the week the basement stacks will become inaccessible except to designated Access Services staff for paging at a specified time on business days at the end of the construction day. The material in the basement includes microforms, as well as material in the call number ranges J-N in regular and compact shelving. Please note that paging from the compact shelving will be on a different schedule when the sprinklers are installed over those particular areas. Note that Phase 3 includes key traffic corridors to elevators, stairs and the loading dock. The contractor plans to maintain access to and from the tunnel during business hours. At least one elevator will be operational at all times. At some point the basement rest rooms will be closed. 

Basement staff & service moves:

Monday August 9th Phase 2A staff will move back to their offices. (Note that the Maps & Media reoccupation began on Friday, August 6.)
• ILS staff from 107 to B42
• Maps and media staff from 107A back to basement work areas
• Barbara Eden from 701 to B15
• Jon Frankel and staff from 701 to B42

Wednesday August 11th begins the relocation of the Phase 3 staff, services and operations
• B38-B39 (Binding & Preparations) to 107/107A
• B19  (Desktop Services) to 107E
• B40 (Collection Maintenance – John Marmora and staff) to 110

Thursday August 12th completes the relocation of the Phase 3 staff, services and operations
• B31-B32 staff and equipment (Conservation) to 107. (Note that Michele Brown will temporarily move to Mann Library Preservation.)

The Copy Center will reopen soon. The move will be scheduled this week and the reopening date will be posted when finalized.