7/26/10 Update
7/26/10 – Work is progressing in the following areas of the basement B12-B17 (Maps & Media), B42 (Interlibrary Services & Collection Maintenance), B52 (locked stacks/storage), and B41 (Copy Center) and on the southeast end of the 2nd floor, which will become temporary library staff surge space first semester 2010. Please refer to phasing schedule online […]
7/19/10 Update
7/19/10 – Work is progressing in rooms B12, B42 and the sub-basement; work should begin in the second floor staff space this week. Please refer to phasing schedule online – https://blogs.cornell.edu/firesafety/schedule/
Copy Center in Olin Library temporarily closed during construction
The Copy Center in the Olin Library basement will be temporarily closed: approximately from Tuesday 7/20/2010 through Friday 8/16/2010. Patrons can still request copying and thesis services by the online link at http://bigredprint.cornell.edu/. Services will also be available at the Print Shop at 695 Dryden Rd (255-2524, digital@cornell.edu) or Center Sage located in B26 Sage […]