Skip to main content



8/30/10 Update

Phase 4 construction (7th and 8th floors), including asbestos abatement on each floor,  begins on Monday, August 30th. The 7th floor will close to the public on Tuesday, August 31. Call number ranges B-CT will be inaccessible to the public. As with the rest of the project, we will page material from the floor every business day after the construction day is over. Patrons can request material to be paged either in person at the desk, via e-mail okucirc@cornell.edu or by calling 255-4245.

Construction continues on the second floor, basement, and sub-basement. Call numbers J-N, as well as all microforms and microfilm, which are  all in the basement, also remain inaccessible to the public until the completion of the phase (projected for 9/10.)

The Copy Center is now open but access is only through the elevators. Ask at the Circulation Desk for directions.

Comments

Comments are closed.

Update Categories