Jul 2nd, 2012
Fernow Renovation Update 6-29-12
The framing for the new classroom is up:
The framing has started on the ground floor, this picture is looking south west:
The foundation waterproofing is complete and the terracing outside the southeast offices is in place. Each terrace will be planted.
This is the first floor entryway facing east with the main entrance (facing Tower Road) on the right and the main office on the left. The archway on the right was one of the original features of Fernow:
This is the new Bernhard’s Parlor, in the same location as the former one. This will only be a breakroom, the copy/mailroom will be across the hall.
This is the second floor hallway facing east:
…and the second floor hallway facing west.
A typical faculty office.
A typical conference room, there will be one on each floor (a bit smaller on the ground and third floors):
A third floor corner office (Grad offices and Associates offices):