<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Soil Contamination: What Gardeners Need To Know</title>
	<atom:link href="http://blogs.cornell.edu/gblblog/2010/12/01/soil-contamination-what-gardeners-need-to-know/feed/" rel="self" type="application/rss+xml" />
	<link>http://blogs.cornell.edu/gblblog/2010/12/01/soil-contamination-what-gardeners-need-to-know/</link>
	<description></description>
	<lastBuildDate>Wed, 15 May 2013 13:07:50 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://blogs.cornell.edu/?v=3.4.1</generator>
	<item>
		<title>By: pH Preferences &#124;</title>
		<link>http://blogs.cornell.edu/gblblog/2010/12/01/soil-contamination-what-gardeners-need-to-know/comment-page-1/#comment-816</link>
		<dc:creator>pH Preferences &#124;</dc:creator>
		<pubDate>Wed, 03 Oct 2012 12:31:44 +0000</pubDate>
		<guid isPermaLink="false">http://blogs.cornell.edu/gblblog/?p=771#comment-816</guid>
		<description>[...] Adjusting Soil pH and pH preferences &#160; Ensure the treated area receives 2.5 cm (1 inch) of water, either from rain or a sprinkler, within 7 days of application. This will activate the corrective treatment. Amounts listed are in kg per 10 sq meters. * - Do not add more than 2.5 kg/10 sq m. of lime in one application. If more lime is required a second application can be made in two weeks. Allow 30 days before testing again. Allow 30 days after adding lime or sulfate before adding fertilizer. &#160;Whether you are working with a Traditional Garden Or A Raised Bed Garden, it will be very important ...span&gt; [...]</description>
		<content:encoded><![CDATA[<p>[...] Adjusting Soil pH and pH preferences &nbsp; Ensure the treated area receives 2.5 cm (1 inch) of water, either from rain or a sprinkler, within 7 days of application. This will activate the corrective treatment. Amounts listed are in kg per 10 sq meters. * &#8211; Do not add more than 2.5 kg/10 sq m. of lime in one application. If more lime is required a second application can be made in two weeks. Allow 30 days before testing again. Allow 30 days after adding lime or sulfate before adding fertilizer. &nbsp;Whether you are working with a Traditional Garden Or A Raised Bed Garden, it will be very important &#8230;span&gt; [...]</p>
]]></content:encoded>
	</item>
</channel>
</rss>
