As the Engineering Library continues its transition to a virtual library the physical collections will move out of Carpenter Hall this summer. Details, updates, and background are available at: http://engineering.library.cornell.edu/node/6791 We will begin moving books on May 23 and the move will be complete by the end of June. All books that have circulated in [...]
Engineering Library Transition Update May 20, 2011
May 20th, 2011 — Uncategorized
